This is the main lobby, as seen from above after its refresh in Summer 2021. Most construction by Doctacosa, underwater sections by Exodio!
4.5 MB

Lobby, seen on September 2021

1920 × 1080 — PNG 4.5 MB

Subida hace 2 años — 4090 visitas

This is the main lobby, as seen from above after its refresh in Summer 2021. Most construction by Doctacosa, underwater sections by Exodio!