This is the main lobby, as seen from above after its refresh in Summer 2021. Most construction by Doctacosa, underwater sections by Exodio!
4.5 MB

Lobby, seen on September 2021

1920 × 1080 — PNG 4.5 MB

Envoyé il y a 2 ans — 4125 vues

This is the main lobby, as seen from above after its refresh in Summer 2021. Most construction by Doctacosa, underwater sections by Exodio!