This is the main lobby, as seen from above after its refresh in Summer 2021. Most construction by Doctacosa, underwater sections by Exodio!
4.5 MB

Lobby, seen on September 2021

1920 × 1080 — PNG 4.5 MB

Terunggah 2 tahun yang lalu — 4121 dilihat

This is the main lobby, as seen from above after its refresh in Summer 2021. Most construction by Doctacosa, underwater sections by Exodio!