This is the main lobby, as seen from above after its refresh in Summer 2021. Most construction by Doctacosa, underwater sections by Exodio!
4.5 MB

Lobby, seen on September 2021

1920 × 1080 — PNG 4.5 MB

Enviado a 2 anos atrás — 4070 visualizações

This is the main lobby, as seen from above after its refresh in Summer 2021. Most construction by Doctacosa, underwater sections by Exodio!